The records were checked
The bathroom on site was compared with the historic council record so the unconsented WC scope could be defined clearly.
Jon bought a Christchurch home and later found that a toilet in the main bathroom was not shown on the council record. ArchSolutioNZ checked the evidence pathway, prepared the retrospective plans and helped secure Christchurch City Council approval.
Bottom line
Start with evidence, not guesswork. This story shows how record checks, drainlayer proof, current plans and a focused Certificate of Acceptance package helped a homeowner resolve a hidden compliance issue after purchase.

The discovery
Jon was not trying to design a new bathroom. He was dealing with a problem inherited after buying the property: a toilet had been installed in the main bathroom, but the council record did not show that WC.
The practical question was whether the completed work could be documented well enough for Christchurch City Council to assess it through a Certificate of Acceptance pathway.
"We were unsure if it would be possible to get this accepted retrospectively."
Jon H.
"Alejandro was great to deal with, told us exactly what we needed, gave us options of how to proceed and then got on with it and got it sorted in a good timeframe."
Jon H., Christchurch homeowner
How it was handled
A CoA application for work already completed depends on the quality of the evidence. The project needed record comparisons, current existing drawings, wastewater information and proof from the people who had carried out the work.
The bathroom on site was compared with the historic council record so the unconsented WC scope could be defined clearly.
Before pushing ahead, ArchSolutioNZ checked whether there was enough drainlayer, photographic and plan evidence for a realistic CoA application.
The application package brought together Form 8 support, current existing plans, record comparisons, drainage information and specialist evidence.
The technical pathway was explained in plain English for the homeowner and in council-ready language for Christchurch City Council.
"Alejandro explained the process clearly and gave us confidence that there was a pathway."
Jon H.
Evidence made the difference
The strongest CoA applications do not rely on a claim that the work "looks fine". They show council what exists, how it connects, and what evidence supports the completed work.
In this case, Jon was able to obtain useful drainlayer information, including an as-built sketch and photographs showing the wastewater connection.
"Everything was explained in a clear and concise email that set out the process."
Jon H.




Plan comparison
Council should not have to guess what changed. The documentation made the unconsented WC scope visible by comparing the historic council record with the current existing condition.


"The most helpful part was knowing exactly what evidence council would need before the application was lodged."
Jon H.
Drainage documentation
The current existing drainage plan showed the added WC connection in context with the existing wastewater system. That gave council a clearer way to assess what had been installed.
The CoA evidence sheet then tied the plan information to photos from the actual installation.



The outcome
The Certificate of Acceptance application was submitted to Christchurch City Council on 29 April 2026 and approved on 6 May 2026.
The approval evidence was redacted for publication, but it confirms the key result: the unconsented WC and related documentation were accepted through the CoA pathway for the assessed scope.
Before lodging
Feasibility and evidence checked
29 Apr 2026
CoA application submitted
06 May 2026
Certificate of Acceptance approved

Client answers
These answers show the problem, the decision to get expert help, and what mattered most during the Certificate of Acceptance process.
A toilet installed in the main bathroom.
Sorting out the process to submit the matter to council was the difficult part, so using someone who knew the process made sense.
The main concern was not necessarily the quality of the work, but that the previous owners had not properly consented it.
Jon found ArchSolutioNZ through Google, compared options, and chose the team because they came back with a clear plan of action.
The right questions were asked early, and the information and documents needed for the Certificate of Acceptance were explained clearly.
Everything was explained in a clear and concise email that set out the process.
Jon was guided on what to chase from the previous owners, who then helped identify the plumber and obtain useful documents and photos.
They were absolutely necessary because the plans detailed exactly where everything was located.
Yes. The application dealt with wastewater line connections, plumbing ventilation considerations, and specialist plumbing and drainage evidence.
It made the process easier and quicker because ArchSolutioNZ knew the procedure to get the matter sorted.
Jon said ArchSolutioNZ took control of the process.
Yes. Jon said it was very easy because this was ArchSolutioNZ's area of expertise.
Yes.
Jon described the communication as very clear.
Yes.
Jon answered no to this question. The honest value in this story was not a dramatic saving claim; it was getting the correct information gathered, submitted and approved efficiently.
Absolutely.
The ease of getting the CoA through quickly and efficiently.
Yes. Jon said Alejandro was very easy to deal with and very clear in his communication.
Alejandro was great to deal with, told us exactly what we needed, gave us options of how to proceed and then got on with it and got it sorted in a good timeframe.


What this story shows
A Certificate of Acceptance is not automatic. The stronger the evidence trail, the easier it is to explain the completed work clearly and avoid sending council an incomplete story.
For completed or unconsented work that needs a retrospective council pathway.
View pathwayFor photos, as-built information, trade evidence and documents that help council assess work already completed.
View pathwayFor checking whether a Certificate of Acceptance pathway is realistic before committing to the full application.
View pathwayFound unconsented work after buying a house?