    Jon bought a Christchurch home and later found that a toilet in the main bathroom was not shown on the council record. ArchSolutioNZ checked the evidence pathway, prepared the retrospective plans and helped secure Christchurch City Council approval.

    Real client storyChristchurchCertificate of AcceptanceApproved 6 May 2026

    Bottom line

    A clear CoA pathway turned an inherited unconsented WC into an approved council record.

    Start with evidence, not guesswork. This story shows how record checks, drainlayer proof, current plans and a focused Certificate of Acceptance package helped a homeowner resolve a hidden compliance issue after purchase.

    Existing bathroom showing the WC that needed Certificate of Acceptance documentation
    The WC existed on site, but the council record did not show it as consented work.

    The discovery

    The bathroom had changed, but the property record had not.

    Jon was not trying to design a new bathroom. He was dealing with a problem inherited after buying the property: a toilet had been installed in the main bathroom, but the council record did not show that WC.

    The practical question was whether the completed work could be documented well enough for Christchurch City Council to assess it through a Certificate of Acceptance pathway.

    Original client answers
    Christchurch City Council approval evidence
    Drainlayer photos and as-built sketch
    Council record vs current existing plans
    "We were unsure if it would be possible to get this accepted retrospectively."

    Jon H.

    "Alejandro was great to deal with, told us exactly what we needed, gave us options of how to proceed and then got on with it and got it sorted in a good timeframe."

    Jon H., Christchurch homeowner

    How it was handled

    Feasibility first, then a council-ready Certificate of Acceptance package.

    A CoA application for work already completed depends on the quality of the evidence. The project needed record comparisons, current existing drawings, wastewater information and proof from the people who had carried out the work.

    The records were checked

    The bathroom on site was compared with the historic council record so the unconsented WC scope could be defined clearly.

    The evidence pathway was tested

    Before pushing ahead, ArchSolutioNZ checked whether there was enough drainlayer, photographic and plan evidence for a realistic CoA application.

    The CoA package was prepared

    The application package brought together Form 8 support, current existing plans, record comparisons, drainage information and specialist evidence.

    Council communication was handled

    The technical pathway was explained in plain English for the homeowner and in council-ready language for Christchurch City Council.

    "Alejandro explained the process clearly and gave us confidence that there was a pathway."

    Jon H.

    Evidence made the difference

    Photos and drainlayer information helped reduce uncertainty.

    The strongest CoA applications do not rely on a claim that the work "looks fine". They show council what exists, how it connects, and what evidence supports the completed work.

    In this case, Jon was able to obtain useful drainlayer information, including an as-built sketch and photographs showing the wastewater connection.

    "Everything was explained in a clear and concise email that set out the process."

    Jon H.

    Redacted as-built drainage sketch supplied for Certificate of Acceptance evidence
    Drainlayer as-built sketch supplied as part of the evidence trail.
    Wastewater connection photo used for Certificate of Acceptance evidence
    Photo evidence of the 100mm wastewater connection.
    Drainage installation photograph showing the wastewater connection work
    Drainage installation evidence from the completed work.
    Backfilled drainage pipe photo used for Certificate of Acceptance evidence
    Installed drainage pipe with bedding and backfill evidence.

    Plan comparison

    The drawings showed the difference between the council record and the current bathroom.

    Council should not have to guess what changed. The documentation made the unconsented WC scope visible by comparing the historic council record with the current existing condition.

    Council record floor plan crop showing bathroom before the WC was added
    Council record floor plan: the historic record did not show the WC.
    Current existing floor plan showing the WC location for the CoA scope
    Current existing plan: the WC location was identified as the CoA scope.
    "The most helpful part was knowing exactly what evidence council would need before the application was lodged."

    Jon H.

    Drainage documentation

    The wastewater connection had to be explained, not just photographed.

    The current existing drainage plan showed the added WC connection in context with the existing wastewater system. That gave council a clearer way to assess what had been installed.

    The CoA evidence sheet then tied the plan information to photos from the actual installation.

    Current existing plumbing and drainage plan showing the 100mm WC wastewater connection
    Current existing drainage plan showing the added WC connection.
    Council record plumbing and drainage plan used for comparison
    Original council record drainage plan used for comparison.
    Certificate of Acceptance evidence sheet showing drainage installation photographs
    Evidence sheet included in the CoA package.

    The outcome

    Submitted 29 April 2026. Approved 6 May 2026.

    The Certificate of Acceptance application was submitted to Christchurch City Council on 29 April 2026 and approved on 6 May 2026.

    The approval evidence was redacted for publication, but it confirms the key result: the unconsented WC and related documentation were accepted through the CoA pathway for the assessed scope.

    Before lodging

    Feasibility and evidence checked

    29 Apr 2026

    CoA application submitted

    06 May 2026

    Certificate of Acceptance approved

    Redacted Christchurch City Council Certificate of Acceptance approval letter
    Redacted approval letter from Christchurch City Council.

    Client answers

    The story is based on Jon's original 20 answers.

    These answers show the problem, the decision to get expert help, and what mattered most during the Certificate of Acceptance process.

    1

    What unconsented building work were you trying to regularise?

    A toilet installed in the main bathroom.

    2

    Before working with ArchSolutioNZ, what felt most confusing or stressful?

    Sorting out the process to submit the matter to council was the difficult part, so using someone who knew the process made sense.

    3

    What were your biggest worries before starting the CoA process?

    The main concern was not necessarily the quality of the work, but that the previous owners had not properly consented it.

    4

    Why did you choose ArchSolutioNZ for this Certificate of Acceptance?

    Jon found ArchSolutioNZ through Google, compared options, and chose the team because they came back with a clear plan of action.

    5

    What made you confident ArchSolutioNZ understood what council would need?

    The right questions were asked early, and the information and documents needed for the Certificate of Acceptance were explained clearly.

    6

    How was the retrospective approval process explained?

    Everything was explained in a clear and concise email that set out the process.

    7

    How did ArchSolutioNZ make the hidden drainage issue manageable?

    Jon was guided on what to chase from the previous owners, who then helped identify the plumber and obtain useful documents and photos.

    8

    How important were professional retrospective plans?

    They were absolutely necessary because the plans detailed exactly where everything was located.

    9

    Did ArchSolutioNZ help with compliance elements?

    Yes. The application dealt with wastewater line connections, plumbing ventilation considerations, and specialist plumbing and drainage evidence.

    10

    What was the value of having an architectural specialist guide the process?

    It made the process easier and quicker because ArchSolutioNZ knew the procedure to get the matter sorted.

    11

    How did ArchSolutioNZ reduce pressure around dealing with council?

    Jon said ArchSolutioNZ took control of the process.

    12

    Was it helpful to have property files and council communication managed?

    Yes. Jon said it was very easy because this was ArchSolutioNZ's area of expertise.

    13

    Did ArchSolutioNZ feel proactive and organised?

    Yes.

    14

    How was communication throughout the process?

    Jon described the communication as very clear.

    15

    Did the work feel accurately and professionally presented to council?

    Yes.

    16

    Did ArchSolutioNZ avoid unnecessary costs or disruptive remedial work?

    Jon answered no to this question. The honest value in this story was not a dramatic saving claim; it was getting the correct information gathered, submitted and approved efficiently.

    17

    Did the CoA help protect the property's legal status and marketability?

    Absolutely.

    18

    What was the single greatest value ArchSolutioNZ brought?

    The ease of getting the CoA through quickly and efficiently.

    19

    Would you recommend ArchSolutioNZ to someone with unconsented work?

    Yes. Jon said Alejandro was very easy to deal with and very clear in his communication.

    20

    How would you describe the experience in one sentence?

    Alejandro was great to deal with, told us exactly what we needed, gave us options of how to proceed and then got on with it and got it sorted in a good timeframe.

    Original email screenshot showing the 20 Certificate of Acceptance testimonial questions sent to Jon
    The original 20 questions sent to the client.
    Original email screenshot showing Jon's answers to the 20 testimonial questions
    The original client response used as the source for this story.

    Found unconsented work after buying a house?

    Check the CoA pathway before spending money on the full application.

    Send the address, photos, council records or a short description. ArchSolutioNZ can help identify what evidence council is likely to need and whether a Certificate of Acceptance pathway is realistic.