ArchSolutioNZ Building Consent Specialists

    Certificate of Acceptance services for unconsented work.

    A Certificate of Acceptance can help with certain building work already completed without the required consent. ArchSolutioNZ helps homeowners understand the likely pathway, prepare as-built documentation and coordinate the evidence council may need.

    Unconsented work pathway checksAs-built documentationEvidence package coordinationAuckland and NZ-wide support

    Bottom line

    A CoA is not a late building consent, and it cannot verify everything.

    Start by choosing the right pathway. Council can only assess completed work that can reasonably be verified. Hidden elements may need opening up, specialist reports, remedial work or may be excluded from the Certificate of Acceptance.

    Choose the right pathway

    Find the Certificate of Acceptance support that matches your situation.

    Each pathway below goes deeper into a specific situation. Use the free check if you are still unsure what applies.

    Most popular
    Start here

    Unconsented Building Work

    Best for

    Owners with alterations, additions, decks, sleepouts, bathrooms or converted spaces already built without the right approval.

    Understand whether a Certificate of Acceptance may be possible, what evidence may be needed, and where council may need specialist verification.

    Open next step
    Auckland

    Auckland Council CoA Support

    Best for

    Auckland homeowners dealing with property file gaps, LIM issues, unconsented work or council evidence expectations.

    Clarify the likely CoA pathway, evidence gaps and consultant inputs before lodging with Auckland Council or responding under sale pressure.

    Open next step
    Documents

    CoA Application & Evidence Package

    Best for

    Owners who already know they need a CoA and want help assembling drawings, reports, forms, photos and supporting evidence.

    Prepare a clear package that explains what work is covered, what can be verified, what evidence supports it and what consultants may need to confirm.

    Open next step
    Drawings

    As-Built Drawings for CoA

    Best for

    Completed work with missing, incomplete or poor records where council needs drawings that show what is actually built.

    Create architectural base drawings for unconsented rooms, decks, additions, conversions and property-sale issues where records are thin.

    Open next step
    Wrong term?

    Retrospective Consent vs CoA

    Best for

    People searching for retrospective building consent who need to know whether the real pathway is a CoA, building consent or another route.

    Separate proposed work from completed work, and avoid spending on the wrong approval pathway before the issue is properly understood.

    Open next step
    Property sale

    Buying or Selling with Unconsented Work

    Best for

    Owners, buyers and agents dealing with LIM issues, due diligence questions, settlement pressure or sale objections.

    Identify what the issue appears to be, what evidence exists, and what technical pathway may reduce uncertainty before decisions become urgent.

    Open next step
    Free check

    Not Sure if CoA Applies?

    Best for

    Anyone unsure whether completed work is likely to fit a Certificate of Acceptance pathway.

    Use the free CoA feasibility check before paying for reports, as-built drawings or the wrong council process.

    Open next step

    Evidence depends on the work

    Common unconsented project types and likely evidence.

    Different completed work needs different evidence. Council still decides what can be accepted, and concealed work may require opening-up, qualified reports, remediation or another pathway.

    Garages, sleepouts, second units and house splits

    Use, fire separation, ventilation, sanitation, planning and new or altered services can all affect the pathway.

    Likely evidence: existing-use records, as-built plans, fire and services information, plus specialist review where required.

    Planning a proposed conversion?

    Decks and balconies

    Structure, barriers, stairs, fixings, membranes and durability need to be considered against what can still be inspected.

    Likely evidence: measured drawings, visible framing or opening-up records, structural review and product information.

    Planning proposed deck work?

    Bathrooms, plumbing and drainage

    Waterproofing, fixture changes, plumbing, drainage, ventilation and hidden wet-area work create different verification limits.

    Likely evidence: as-built layouts, photos, installer records, drainage information and waterproofing or specialist evidence.

    Planning proposed wet-area work?

    Additions, openings and removed walls

    Beams, lintels, foundations, bracing and altered load paths can be difficult to verify once linings and finishes conceal the work.

    Likely evidence: as-built drawings, opening-up, structural review and a defined remedial or documentation scope.

    Planning proposed alterations?

    Our CoA process

    A practical pathway from uncertainty to a clearer council package.

    1

    Review the situation

    We review photos, property file information, LIM notes, owner details, drawings, invoices or council correspondence.

    2

    Confirm the likely pathway

    We identify whether the issue is likely to be CoA, building consent, CCC support, planning advice, remedial work or another council process.

    3

    Prepare the evidence plan

    We identify what as-built drawings, photos, reports, inspections or specialist evidence may be needed.

    4

    Coordinate documents

    We prepare architectural documents and coordinate engineering, drainage, fire, waterproofing or other specialist inputs where relevant.

    5

    Assemble the application

    The CoA package is organised so council can understand what is being applied for and what evidence supports it.

    6

    Support clarification

    If council requests clarification on the documents we prepared, we help update the relevant information and coordinate responses.

    Why ArchSolutioNZ

    Architect-led CoA support with clear service boundaries.

    We help avoid spending on the wrong approval pathway, prepare architectural information that reflects what is actually built, and coordinate specialist input where the scope requires it.

    CoA FAQs

    Questions homeowners ask first.

    What is a Certificate of Acceptance?+

    A Certificate of Acceptance is a council pathway for certain building work that has already been completed without the required building consent. It is not the same as a normal building consent or a Code Compliance Certificate.

    Can a CoA legalise all unconsented work?+

    No. Council can only assess what can reasonably be verified after the work is complete. Some work may need opening up, specialist reports, remedial work, planning advice or another pathway.

    Is retrospective building consent the same as a CoA?+

    People often use the phrase retrospective building consent, but in New Zealand the pathway for completed work without consent is often a Certificate of Acceptance. The correct route depends on what was built, when, and whether any consent already exists.

    What if the work had a building consent but no CCC?+

    That may belong under Council Support rather than a standard CoA pathway. The issue may involve final inspections, old consent records, missing producer statements, remedial work or Code Compliance Certificate strategy.

    Does every unconsented project need the same CoA package?+

    No. The evidence depends on what was built and what can still be verified. A deck may need structural and barrier evidence, while a bathroom may need waterproofing, plumbing and drainage evidence. A CoA is not guaranteed, and hidden work may need opening-up, specialist reports or remediation.

    Official references

    Useful official sources for CoA decisions.

    These official resources help explain why CoA evidence, scope and verification limits matter.

    Not sure if your unconsented work can be accepted by council?

    Start with a pathway check. Send the work description, photos, property file notes or council correspondence and we will help identify the sensible next step.