ArchSolutioNZ Building Consent Specialists
    Before You StartConsent pathwayFeasibility tools5 min read

    Project Feasibility Before Building Consent

    Check the likely pathway before you pay for full drawings. A good feasibility check can reveal whether your project needs building consent, may be exempt, needs planning advice, belongs in a CoA pathway, or should be redesigned before it becomes expensive.

    Quick Answer

    Project feasibility before building consent is the early check that confirms the likely approval pathway, site risks, planning constraints, consultant needs and next documents before detailed design begins.

    Use a broad Feasibility & Scope Report when your project is still an idea.
    Use Granny Flat Feasibility when the project is a minor dwelling, granny flat or self-contained unit.
    Use CoA Feasibility when the work has already been completed without the required consent.

    How to Check Feasibility Before Building Consent

    Step 1

    Start with the Project Type

    Feasibility starts by naming the project clearly. A bathroom renovation, deck, reclad, granny flat, garage conversion or unconsented alteration can each point to a different consent pathway.

    • Write down what you want to build, alter, remove or legalise.
    • Separate proposed work from work that has already been completed.
    • Note whether the project is residential, commercial or mixed use.
    • List any known council history, old plans, property file notes or previous consent references.

    A clear project description helps avoid paying for drawings before the correct pathway is known.

    Step 2

    Check Whether Building Consent Is Likely

    The first feasibility question is whether the proposed work is likely to need a building consent, may be exempt under Schedule 1, or needs a more detailed professional check.

    • Check whether the work affects structure, weathertightness, fire safety, plumbing, drainage, accessibility or durability.
    • Consider whether Schedule 1 exempt building work may apply.
    • Remember that exempt work must still comply with the New Zealand Building Code.
    • Use a consent pathway check before assuming a small job is automatically low risk.

    Exempt does not mean informal. The work still needs to be designed and built properly.

    Step 3

    Separate Building Consent from Planning Risk

    Building consent checks Building Code compliance. Planning checks look at zoning, overlays, yards, height, site coverage, use and other district plan controls.

    • Check zoning, overlays, flood maps, heritage, special character and site constraints where relevant.
    • For Auckland projects, review Auckland Unitary Plan controls before concept design is locked in.
    • For rural, coastal or hazard-prone sites, check whether land stability, flooding, wastewater or access may change the pathway.
    • If planning risk is unclear, get advice before preparing a full building consent package.

    A project can be buildable under the Building Code but still need planning advice or resource consent.

    Step 4

    Identify Site Constraints Early

    Site constraints often decide whether a project is simple, needs consultants, or should be redesigned before money is spent on detailed drawings.

    • Check title, easements, consent notices, cross-lease issues and boundary limitations.
    • Look for stormwater, wastewater, public drainage, flood plains, overland flow paths and geotechnical issues.
    • For granny flats and minor dwellings, check site capacity, servicing, access and hazards before assuming the project qualifies.
    • For additions, decks and conversions, check structure, bracing, fire separation, dampness and weathertightness risk.
    Step 5

    Choose the Correct Feasibility Tool

    Different feasibility tools answer different questions. Use the broad feasibility report for general projects, the granny flat check for minor dwellings, and the CoA check for work already built without consent.

    • Use the Feasibility & Scope Report when the project is still an idea and you need a first pathway summary.
    • Use the Granny Flat Feasibility Check for minor dwellings, granny flats, self-contained units and site-specific servicing questions.
    • Use the CoA Feasibility Check for completed work that may need a Certificate of Acceptance.
    • Use direct contact when you already have council comments, an RFI, a Notice to Fix or a time-sensitive property issue.

    The right tool gives a cleaner starting point and avoids mixing future building work with retrospective compliance issues.

    Step 6

    Decide What Professional Input Is Needed

    A feasibility check should identify which professionals may be needed before design or consent documentation begins.

    • Architectural design and consent drawings for proposed building work.
    • Structural engineering where foundations, beams, bracing, decks, openings or load paths are affected.
    • Geotechnical, drainage, stormwater, wastewater, H1 energy or fire input where the site or use requires it.
    • Building surveyor or specialist reports where existing or unconsented work needs evidence.
    Step 7

    Turn the Feasibility Check into a Next Step

    The purpose of feasibility is not to create a pile of options. It should lead to a clear next step: proceed, redesign, gather more evidence, check council records or pause.

    • Summarise the likely consent pathway in plain English.
    • List the main risks, missing information and consultant inputs.
    • Decide whether concept design, consent drawings, CoA support, planning advice or council support is the right next move.
    • Request a fixed-fee professional scope once the pathway is clear enough.

    Good feasibility reduces surprises before council, builders or consultants are fully engaged.

    Choose the Right Feasibility Starting Point

    These tools answer different questions. Pick the one that matches the stage of the project, then move into design, consent drawings, CoA support or council support once the direction is clearer.

    General projects

    Feasibility & Scope Report

    Best when the project is still an idea and you need a plain-English first-pass view of consent triggers, likely risks, professionals, timeline and next steps.

    Open tool

    Minor dwellings

    Granny Flat Feasibility Check

    Best for granny flats, minor dwellings and self-contained units where site size, zoning, flood risk, wastewater, stormwater and servicing need early review.

    Open tool

    Already built

    CoA Feasibility Check

    Best when building work has already been completed without the required consent and you need to understand whether a Certificate of Acceptance pathway may be realistic.

    Open tool

    What a Feasibility Check Should Cover

    Consent trigger

    • Building consent likely
    • Schedule 1 may apply
    • CoA pathway may apply
    • Council support may be needed first

    Planning and property risk

    • Zoning and overlays
    • Flood or natural hazard maps
    • Title limits and consent notices
    • Cross-lease or shared property issues

    Technical scope

    • Structure and bracing
    • Weathertightness
    • Plumbing and drainage
    • Fire, H1 energy, ventilation or accessibility

    Next-step documents

    • Existing plans and photos
    • Property file records
    • Concept sketches
    • Council notes, LIM or inspection comments

    Which Pathway Usually Fits?

    You are planning new work

    Feasibility & Scope Report, then concept design or building consent documentation

    You want a granny flat or minor dwelling

    Granny Flat Feasibility Check, then design, servicing checks and consent pathway confirmation

    The work was already built without consent

    CoA Feasibility Check, then evidence gathering, as-built drawings or council advice

    Council has already raised an issue

    Council Support, RFI response, Notice to Fix support or CCC pathway advice

    Related Next Steps

    Feasibility & Planning

    Use this hub when the project is not ready for consent documentation yet.

    View pathway

    Do I Need Building Consent?

    A focused pathway for project-specific building consent trigger questions.

    View pathway

    Schedule 1 Exemptions

    Useful when the work may not need building consent but still needs Building Code care.

    View pathway

    Building Consent Services

    Use this when feasibility is clear and the project needs consent drawings and specifications.

    View pathway

    Official References

    These references explain consent triggers, exempt building work and the wider building consent pathway in New Zealand.

    Common Questions

    What is project feasibility before building consent?

    Project feasibility is an early check of the likely consent pathway, planning constraints, site risks, consultant inputs and next documents needed before paying for full design or building consent documentation.

    Is a feasibility check the same as a building consent?

    No. A feasibility check is preliminary guidance. A building consent is council approval for proposed building work after drawings, specifications and supporting documents have been assessed.

    When should I use the CoA feasibility tool instead?

    Use the CoA feasibility tool when the building work has already been completed without the required building consent. That is a retrospective pathway and should not be mixed with a normal proposed-work consent.

    When should I use the granny flat feasibility tool?

    Use the granny flat feasibility tool for minor dwelling and self-contained unit questions, especially where site size, zoning, flood risk, wastewater, stormwater or access may affect the project.

    What should I prepare before asking for feasibility advice?

    Prepare the property address, a short description of the proposed or completed work, photos, sketches, existing plans, council notes, LIM information or property file records if available.

    Want a clearer pathway before building consent?

    Start with the free feasibility and scope tool, then send ArchSolutioNZ the project details if you want a professional next-step review.