Bottom line
Different unconsented projects need different evidence.
A deck, bathroom, garage conversion, sleepout or house split will not be assessed the same way. The CoA pathway depends on what was built and what can now be verified.
Some completed projects create repeated Certificate of Acceptance issues because they affect structure, moisture, fire safety, drainage, services, use or habitable space requirements.
Bottom line
A deck, bathroom, garage conversion, sleepout or house split will not be assessed the same way. The CoA pathway depends on what was built and what can now be verified.
Best fit
Use this pathway when the situation matches the points on the right. If the work is proposed rather than completed, start with Building Consent Services instead.
Owners who know work was completed but are unsure what evidence type is likely.
Garage, sleepout, deck, bathroom, drainage, second dwelling or structural alteration concerns.
Homeowners deciding whether to use the CoA feasibility check or contact ArchSolutioNZ.
What may be included
Garage conversion CoA issues: slab moisture, insulation, ventilation, natural light, fire separation and habitable space.
Sleepout and cabin issues: sleeping use, services, exemption limits and detached-building evidence.
Deck and balcony issues: structure, barriers, stairs, durability and safety from falling.
Bathroom and drainage issues: waterproofing, plumbing, drainage and as-built evidence.
Second dwelling and house split issues: fire, drainage, planning, rates and development contribution questions.
Extension and structural issues: removed walls, new openings, additions and hard-to-verify structural work.
Council assessment
| Issue | What to clarify | Why it matters |
|---|---|---|
| Structure | Deck framing, removed walls, beams, foundations and new openings. | Completed structural work can be difficult to verify without specialist evidence. |
| Moisture | Bathrooms, cladding, decks, balconies, drainage and wet areas. | Moisture failures can remain hidden until damage appears. |
| Use change | Garages, sleepouts, house splitting and second kitchens. | Changing use can trigger fire, ventilation, sanitation and planning issues. |
| Services | Plumbing, drainage, stormwater, wastewater and electrical records. | Service changes usually need credible as-built evidence. |
Process
We review photos, property file information, LIM notes, owner details, invoices, drawings or council correspondence.
We separate what appears to be covered by the CoA question from work that may belong on another pathway.
We identify likely as-built drawings, specialist reports, photos, opening-up or product evidence that may be needed.
We help organise the documentation pathway before you spend money on the wrong report or application.
Related resources
The guide explains the rules in plain English, while the free tool helps you check whether the issue appears suitable for a CoA pathway before spending on reports.
Related pathways
FAQs
No. Council can only assess what can reasonably be verified after the work is complete. Hidden work may need opening up, specialist reports, remedial work or may be excluded.
No. A building consent is for proposed work before construction. A Certificate of Acceptance is a limited pathway for certain completed work that was carried out without the required consent.
Send photos, your address, a short description of the work, any council letters, LIM notes, property file information, invoices, drawings or reports you already have.
No. Evidence depends on the work. A deck may need structural and barrier evidence, while a bathroom may need waterproofing and plumbing evidence.
Official references
These references help explain why evidence, scope and verification limits matter.
Use the free CoA feasibility check or send us the project details so we can help identify the likely documentation pathway.