    As-built drawings for Certificate of Acceptance applications.

    When original consent drawings are missing or the built work does not match records, as-built drawings help document what exists so the CoA package has a clear architectural base.

    Existing plansScope diagramsAs-built elevationsConsultant-ready drawings

    Bottom line

    As-built drawings show what exists, not what should have been built.

    For CoA work, drawings need to separate visible facts from assumptions. They may support consultant review, evidence schedules and council assessment, but they do not prove hidden work by themselves.

    Best fit

    Who this page is for.

    Use this pathway when the situation matches the points on the right. If the work is proposed rather than completed, start with Building Consent Services instead.

    Unconsented rooms, decks, additions, conversions or wet areas.

    Property-sale issues where drawings are missing or incomplete.

    Applications needing a clearer technical base for consultants and council.

    What may be included

    The information council may need to understand.

    Existing and as-built floor plans.

    Elevations and sections where relevant.

    Scope diagrams showing the affected area.

    Construction notes based on visible or evidenced work.

    Details required for consultant review.

    Coordination notes showing what remains uncertain or needs specialist evidence.

    Council assessment

    What usually drives the CoA risk.

    IssueWhat to clarifyWhy it matters
    AccuracyMeasured layouts, visible construction and available records.Council and consultants need a reliable base for assessment.
    AssumptionsWhere construction cannot be confirmed from visible evidence.Assumptions should not be presented as verified facts.
    Affected areaThe parts of the building connected to the CoA scope.A CoA should clearly identify what work is being assessed.
    Consultant useDrawings that engineers, drainlayers, fire consultants or surveyors can review.Specialists often need clear as-built information before writing reports.

    Process

    A practical path through this CoA issue.

    1

    Review records

    We review photos, property file information, LIM notes, owner details, invoices, drawings or council correspondence.

    2

    Define the scope

    We separate what appears to be covered by the CoA question from work that may belong on another pathway.

    3

    Identify evidence gaps

    We identify likely as-built drawings, specialist reports, photos, opening-up or product evidence that may be needed.

    4

    Prepare next steps

    We help organise the documentation pathway before you spend money on the wrong report or application.

    FAQs

    Questions homeowners ask first.

    Can council accept all completed work through a CoA?+

    No. Council can only assess what can reasonably be verified after the work is complete. Hidden work may need opening up, specialist reports, remedial work or may be excluded.

    Is a CoA the same as a building consent?+

    No. A building consent is for proposed work before construction. A Certificate of Acceptance is a limited pathway for certain completed work that was carried out without the required consent.

    What should I send first?+

    Send photos, your address, a short description of the work, any council letters, LIM notes, property file information, invoices, drawings or reports you already have.

    Can as-built drawings prove hidden construction?+

    No. They can document visible and evidenced work, but hidden construction may still need opening up, specialist reports or may remain uncertain.

    Official references

    Useful official CoA sources.

    These references help explain why evidence, scope and verification limits matter.

    Need as-built drawings for a CoA?

    Send photos, old plans, council records and a description of the completed work. We can help identify the drawing scope.